Maturation of PCM-HSD Technology
Programme
GSTP
Programme Reference
GT17-149MT
Prime Contractor
WALOPT
Subcontractors
CRM CENTRE DE RECHERCHES METALLURGIQUES ASBL
Belgium
SONACA SA
Belgium
Start Date
End Date
Status
Closed
Country
Belgium
Objectives
Based on previous development, the objective is to develop a mass-efficient heat accumulators using PCM (Phase Change Material) to avoid overheating of specific power demanding electronic boxes. More specifically, the goal is to increase the TRL Level to 6-7 by performing more qualification tests, which will provide a higher reliability and confidence in the PCM technology.
Description
A PCM provides a temporary cooling capability of electronics boxes when overheating/absence of effective cooling leads to over-temperature for any type of spacecraft or launcher. The proposed technology saves mass vs traditional heat sinks for applications where high power dissipation occur for a short period of time.
The activity shall focus on the following points: ?
- Radiation resistance of organic PCM?s: samples and whole PCM box, needing a large quantity of PCM to be irradiated under p and gamma
- Perform fatigue testing during thermal cycles (including under vacuum). ?
- Reduce the error on latent heat measurement (compare DSC ? Time history).
- Development of MGSE for filling, un-filling and certification of filling rate.
- Measurement of burst pressure and safety against over pressure.
- Explore feasibility in using additive Manufacturing.
- Establish manufacturing procedures and processes in order to provide a controlled and reliable product.
A product specification shall be supplied by a European Prime to insure full applicability. Engineering and qualification models shall be manufactured in order to perform pre/post irradiation tests, burst tests, in-process tests, filling/unfilling tests and ageing test.
Application Domain
Generic Technologies
Technology Domain
21 - Thermal
24 - Materials and Manufacturing Processes
Competence Domain
2-Structures, Mechanisms, Materials, Thermal
Initial TRL
TRL 5
Target TRL
TRL 7
Achieved TRL
TRL 6
Public Document
Executive Summary