The objective of this activity is to assess the system level and design impacts of optimising a satellite design for on-orbit manufacturing and assembly, as well as preparing it to be refurbished, reused or recycled on orbit afterwards, and to identify the technologies needed.
Thales Alenia Space
The objective of this study was to help define how to maintain and further develop European access to the surface of Mars, the major destination for European exploration, following the most recent approved and developed (or currently in development) missions (ExoMars 2016, ExoMars RSP).
Thales Alenia Space
The focus of this study was the system-level assessment of potential small mission architectures that could operate at Mars in the 2030s, after or potentially in parallel with MSR mission.
In particular two cases were evaluated:
- Mission 1: Mars Communications Constellation (MCC), for supporting assets on the surface and providing science
- Mission 2: Mars Science Orbiter (MSO), a science-driven mission, remote sensing
Thales Alenia Space
The study and exploitation of In Situ Resource Utilisation (ISRU) technologies (with an initial focus on the Moon) are stimulating an increasing interest in the international community, both at Agency and industry levels, in view of and in preparation for future crewed exploration missions and in terms of scientific and societal long-term benefits.
Thales Alenia Space
In this activity, LSI's Airbus, OHB and Thales Alenia Space evaluated CleanSat technologies.
Thales Alenia Space
The project is dedicated to an in-depth study of the re-entry of the ESA's Gravity Field and Steady-State Ocean Circulation Explorer (GOCE) satellite, for which a rich measurement data set is available up to the very end of its decay phase.
Space Dynamics Services
XIPE is designed to be launched with a VEGA-C vehicle into an orbit of 550 km and <6° inclination. With this orbit, eclipses last about 35 minutes. Due to remaining spacecraft fragments the mission is planned to end by controlled re-entry. The baseline ground station is Kourou either for S/S or S/X telemetry band, albeit Malindi (or Singapore) is additionally available, if necessary, for additional downloading capability in case of particularly bright sources. The mission duration is 3+2 years.
Thales Alenia Space
In the future, satellites will have to demonstrate compliance with debris mitigation requirements, covering re-entry or parking graveyard orbits and passivation. Nevertheless, during the mission, a failure could occur without any possibility to manoeuvre the satellite and achieving its compliance to the Space Debris Mitigation requirements. Therefore to anticipate the need to use ADR for deorbiting (or reorbiting) the satellite, it is interesting to evaluate the implication of adapting the satellites and launcher upper stage to support a future ADR mission.
Thales Alenia Space
The purpose of the “Atom Interferometry Test of the Weak Equivalence Principle in Space” study was to conceive and specify an instrument for an atom interferometry test of the Weak Equivalence Principle (Quantum WEP test, QWEP), focusing on the International Space Station (ISS) as space platform.
Thales Alenia Space
Pages
Filter by programme:
Filter by start year:
- 2006 (7) Apply 2006 filter
- 2010 (3) Apply 2010 filter
- 2015 (3) Apply 2015 filter
- 1999 (2) Apply 1999 filter
- 2000 (1) Apply 2000 filter
- 2001 (1) Apply 2001 filter
- 2002 (1) Apply 2002 filter
- 2004 (1) Apply 2004 filter
- 2008 (1) Apply 2008 filter
- 2009 (1) Apply 2009 filter
- 2011 (1) Apply 2011 filter
- 2012 (1) Apply 2012 filter
- 2017 (1) Apply 2017 filter
- 2018 (1) Apply 2018 filter
- 2019 (1) Apply 2019 filter
- 2020 (1) Apply 2020 filter
- 2021 (1) Apply 2021 filter
Filter by end year:
- 2008 (3) Apply 2008 filter
- 2009 (3) Apply 2009 filter
- 2013 (3) Apply 2013 filter
- 2018 (3) Apply 2018 filter
- 2021 (3) Apply 2021 filter
- 1999 (2) Apply 1999 filter
- 2005 (2) Apply 2005 filter
- 2007 (2) Apply 2007 filter
- 2012 (2) Apply 2012 filter
- 2017 (2) Apply 2017 filter
- 2000 (1) Apply 2000 filter
- 2001 (1) Apply 2001 filter
- 2010 (1) Apply 2010 filter
Filter by keywords:
- CleanSpace (2) Apply CleanSpace filter
- Mars (2) Apply Mars filter
- Re-entry (2) Apply Re-entry filter
- ADR (1) Apply ADR filter
- CDF (1) Apply CDF filter
- CleanSat (1) Apply CleanSat filter
- Demisability (1) Apply Demisability filter
- GOCE (1) Apply GOCE filter
- Interferometry (1) Apply Interferometry filter
- ISRU (1) Apply ISRU filter
- ISS (1) Apply ISS filter
- Lander (1) Apply Lander filter
- Lunar Lander (1) Apply Lunar Lander filter
- M4 (1) Apply M4 filter
- Mission (1) Apply Mission filter
- Moon (1) Apply Moon filter
- on-orbit manufacturing (1) Apply on-orbit manufacturing filter
- Passivation (1) Apply Passivation filter
- Physics (1) Apply Physics filter
- Small Satellites (1) Apply Small Satellites filter
- Space debris (1) Apply Space debris filter
- Spacecraft (1) Apply Spacecraft filter
- Surface Platform (1) Apply Surface Platform filter
- System Study (1) Apply System Study filter
- XIPE (1) Apply XIPE filter
Filter by contractor:
- (-) Remove space filter space
- alenia (16) Apply alenia filter
- thale (13) Apply thale filter
- carlo (9) Apply carlo filter
- gavazzi (9) Apply gavazzi filter
- alcatel (3) Apply alcatel filter
- engin (2) Apply engin filter
- s.p.a (2) Apply s.p.a filter
- spa (2) Apply spa filter
- dynam (1) Apply dynam filter
- servic (1) Apply servic filter
Filter by country:
- (-) Remove Italy filter Italy
Filter by application domain:
Filter by competence domain:
Filter by technology domain:
- 8 - System Design & Verification (2) Apply 8 - System Design & Verification filter
- 22 - Environmental Control & Life Support (ECLS) and In Situ Resource Utilisation (ISRU) (1) Apply 22 - Environmental Control & Life Support (ECLS) and In Situ Resource Utilisation (ISRU) filter
- 24 - Materials and Manufacturing Processes (1) Apply 24 - Materials and Manufacturing Processes filter