Auroral Oval Monitoring Mission Reorientation Phase A
Programme
Preparation
Programme Reference
21-P-M-OPS-03-a
Contractor
OHB Sweden
Start Date
End Date
Status
Closed
Country
Sweden

Description
This Auroral Oval Monitoring (AOM) Phase A study was a reorientation after the previous Phase AB1, with a simplified payload prioritizing auroral observation and a complete redesign of the mission. The first part of the study was to update the mission architecture with an affordable, sustainable, and scalable solution resulting in a Mission Definition Review (MDR). For evaluation of the payload, the payload module prime from the previous Phase AB1, Thales Alenia Space UK (TAS-UK) was strengthened with a group of end-user advisors from UK Met Office and FMI to advise the consortium directly on the choice of orbit, instruments and help with the commercialization analysis.
Technology Domain
6 - RF Subsystems, Payloads and Technologies
8 - System Design & Verification
Executive summary