Skip to main content

Deep Space Navigation with Pulsars (parallel 2)

Programme Reference

2012-13

Country

Spain

Start Date

2012

End Date

2013

Programme: Discovery Prime Contractor: GMV

Description

The XNAV concept has been analysed in detail. The performances obtained from simulations have been validated successfully using real data from XMM-Newton space telescope. The performances obtained using real data are not in line with the XNAV performances (100 m for the Crab pulsar) due to limitations in the XMM-Newton instrument operations. We have been forced to use a source much fainter than the Crab pulsar and surrounded by a background much stronger than expected.

Application domain: Generic Technologies

Initial TRL: TRL N/A Target TRL: TRL N/A

Public Document:

Executive Summary
PDF

Deep Space Navigation with Pulsars (parallel 2)