Skip to main content

IOS Mission Proposal and Maturation Phase

Programme Reference

21-P-M-OPS-04

Status

Closed

Country

United Kingdom

Start Date

2022

End Date

2022

Programme: Preparation Prime Contractor: D-orbit

Description

The results of the IOSPR maturation phase study done by D-Orbit (UK) are presented.

• Application domain: Space Safety

•
Technology Domain:
11 - Space Debris
19 - Propulsion
08 - System Design & Verification
09 - Mission Operation and Ground Data Systems
•
Competence Domain:
07 - Propulsion, Space Transportation and Re-entry Vehicles
08 - Ground Data Systems / Mission Operations
10 - Astrodynamics / Space Debris / Space Environment
• Initial TRL: TRL N/A • Target TRL: TRL N/A • Achieved TRL: TRL N/A

•Public Document:

Final Presentation
PDF
→

IOS Mission Proposal and Maturation Phase