Science missions such as SPICA (with the Safari instrument) and ATHENA (with the X-IFU instrument) require a complex cryogenic chain to ensure thermal bath temperatures in the order of 50 mK at the level of their respective detectors. The last cooling stage in these complex chains includes an Adiabatic Demagnetization Refrigerator (ADR) that takes advantage of the fact that the entropy of paramagnetic materials in a magnetic field is lower than when no field is present.
NeutronStar Systems UG
The main objective of the project is the reverse engineering of the OPS-SAT system, creating a model of the existing system design. The model aims to be built in a way that it is most useful for OPS-SAT engineers to understand and discuss the existing design and use this as a basis for further development of the OPS-SAT system.
OHB System AG
Nowadays, human Moon exploration, and the consequent desire to establish a permanent settlement on its surface, represents one of the most fascinating challenge to face. The permanent presence of a human outpost very far from Earth raises the problem of the huge amount of payload required for the settlement, as well as the need of rapid and in-time supply of material and spare parts useful for all the activities carried out in-situ, including the realization of medicals tools and patient-specific back-up implants.
OHB System AG
The main objective of the OMAR Mission Architecture study is to identify and trade-off different mission architectures, to provide different services on-orbit. For each of the relevant scenarios, this objective shall be achieved by defining the associated system functional analysis and by trading-off different architectures and concepts of operations. Furthermore, the impact of aspects such as: operational orbit, type of serviced satellites, services provided, different levels of autonomy, and any other relevant factors is to be assessed.
OHB System AG
The activity 'Small Satellite Missions to Mars (S2M2)' is an early-phase architecture study of a potential low-cost mission to Mars as further step in the Mars exploration roadmap developed by ESA.
A potential implementation from industry’s point of view was assessed, applying the strict design-to-cost philosophy by fostering strong reuse of an available OHB platform. Trade-offs were performed for assessing a low-cost mission profile targeting the programmatic constraints that were input to this study.
OHB System AG
Dr. Rainer Gerlich BSSE...
The project aimed to establish a structured approach to an optimised part or component by applying Concurrent Design methods. It intended to incorporate all necessary disciplines and competencies that are required for a potential spacecraft part. Within the activity, advanced manufacturing included various novel techniques, not only additive manufacturing. It means that the Concurrent Design approach was developed for the engineering of units to be built with a broad range of advanced manufacturing technologies.
OHB System AG
The contract was part of the broader framework of two ESA-led mission study teams performing parallel and independent activities to establish the mission concept, considering the ISRU payload (Segment 1), the delivery service (lander, Segment 2) and the communication service (Segment 3).
In this context the scope of the OHB Italia contract activities was related to defining the ISRU Payload.
OHB System AG
Human exploratory missions to the Moon or Mars are widely considered as the next logical steps in human space exploration and, lately, settlement. Such space exploration or settlement activities involve humans spending long periods of time in space and, with increasing distance from Earth, no abort possibilities. Crews on such missions have to be self- sufficient, not only concerning food, drink and waste, but also with respect to medical treatment. Health issues are raised by the environmental conditions in space, such as the influence of altered gravity, radiation and isolation.
OHB System AG
Several studies have addressed the building of a lunar base either under ESA or other space agencies and entities. These studies have looked at conceptual designs, often of one specific element of the base, while most of the requirements are not adequately or not at all taken into consideration.
OHB System AG
Pages
Filter by programme:
Filter by start year:
- 2018 (3) Apply 2018 filter
- 2001 (2) Apply 2001 filter
- 2003 (2) Apply 2003 filter
- 2006 (2) Apply 2006 filter
- 2014 (2) Apply 2014 filter
- 2015 (2) Apply 2015 filter
- 2021 (2) Apply 2021 filter
- 1990 (1) Apply 1990 filter
- 2000 (1) Apply 2000 filter
- 2002 (1) Apply 2002 filter
- 2004 (1) Apply 2004 filter
- 2008 (1) Apply 2008 filter
- 2009 (1) Apply 2009 filter
- 2011 (1) Apply 2011 filter
- 2017 (1) Apply 2017 filter
- 2019 (1) Apply 2019 filter
- 2020 (1) Apply 2020 filter
- 2022 (1) Apply 2022 filter
Filter by end year:
- 2009 (3) Apply 2009 filter
- 2019 (3) Apply 2019 filter
- 2022 (3) Apply 2022 filter
- 2001 (2) Apply 2001 filter
- 2005 (2) Apply 2005 filter
- 2016 (2) Apply 2016 filter
- 2021 (2) Apply 2021 filter
- 1990 (1) Apply 1990 filter
- 2000 (1) Apply 2000 filter
- 2002 (1) Apply 2002 filter
- 2007 (1) Apply 2007 filter
- 2010 (1) Apply 2010 filter
- 2015 (1) Apply 2015 filter
- 2017 (1) Apply 2017 filter
- 2018 (1) Apply 2018 filter
- 2020 (1) Apply 2020 filter
Filter by keywords:
- 3d printing (3) Apply 3d printing filter
- Moon (3) Apply Moon filter
- Additive Manufacturing (2) Apply Additive Manufacturing filter
- Exploration (2) Apply Exploration filter
- Interdisciplinary (2) Apply Interdisciplinary filter
- ISRU (2) Apply ISRU filter
- lunar base (2) Apply lunar base filter
- Mars (2) Apply Mars filter
- 9-Technologies applicable to several Cosmic Vision Missions (1) Apply 9-Technologies applicable to several Cosmic Vision Missions filter
- ALM (1) Apply ALM filter
- Astronaut (1) Apply Astronaut filter
- Biology (1) Apply Biology filter
- CDF (1) Apply CDF filter
- CleanSat (1) Apply CleanSat filter
- Communication (1) Apply Communication filter
- concurrent engineering (1) Apply concurrent engineering filter
- Deorbit (1) Apply Deorbit filter
- Galileo (1) Apply Galileo filter
- Galileo S&R (1) Apply Galileo S&R filter
- Hardware (1) Apply Hardware filter
- incremental improvement (1) Apply incremental improvement filter
- LCM (1) Apply LCM filter
- Lunar Lander (1) Apply Lunar Lander filter
- manufacture (1) Apply manufacture filter
- Materials (1) Apply Materials filter
- MBSE (1) Apply MBSE filter
- Mission architecture (1) Apply Mission architecture filter
- Mission Design (1) Apply Mission Design filter
- moon village (1) Apply moon village filter
- on-orbit manufacturing (1) Apply on-orbit manufacturing filter
- OPS-SAT (1) Apply OPS-SAT filter
- Payload (1) Apply Payload filter
- Propulsion (1) Apply Propulsion filter
- recycle (1) Apply recycle filter
- refurbish (1) Apply refurbish filter
- Regolith (1) Apply Regolith filter
- reverse engineering (1) Apply reverse engineering filter
- Small Satellites (1) Apply Small Satellites filter
- Structure (1) Apply Structure filter
- Tank (1) Apply Tank filter
- topological optimization (1) Apply topological optimization filter
Filter by contractor:
- (-) Remove system filter system
- ag (20) Apply ag filter
- ohb (20) Apply ohb filter
- anit (2) Apply anit filter
- gmbh (2) Apply gmbh filter
- and (1) Apply and filter
- bsse (1) Apply bsse filter
- dr (1) Apply dr filter
- dr. (1) Apply dr. filter
- engin (1) Apply engin filter
- gerlich (1) Apply gerlich filter
- menlo (1) Apply menlo filter
- neutronstar (1) Apply neutronstar filter
- r+i (1) Apply r+i filter
- rainer (1) Apply rainer filter
- ri (1) Apply ri filter
- softwar (1) Apply softwar filter
- ug (1) Apply ug filter
Filter by country:
- (-) Remove Germany filter Germany
Filter by application domain:
Filter by competence domain:
- 2-Structures, Mechanisms, Materials, Thermal (4) Apply 2-Structures, Mechanisms, Materials, Thermal filter
- 6-Life & Physical Science Payloads, Life Support, Robotics & Automation (2) Apply 6-Life & Physical Science Payloads, Life Support, Robotics & Automation filter
- 3-Avionic Systems (1) Apply 3-Avionic Systems filter
- 9-Digital Engineering (1) Apply 9-Digital Engineering filter
Filter by technology domain:
- 8 - System Design & Verification (3) Apply 8 - System Design & Verification filter
- 24 - Materials and Manufacturing Processes (3) Apply 24 - Materials and Manufacturing Processes filter
- 22 - Environmental Control & Life Support (ECLS) and In Situ Resource Utilisation (ISRU) (2) Apply 22 - Environmental Control & Life Support (ECLS) and In Situ Resource Utilisation (ISRU) filter
- 2 - Space System Software (1) Apply 2 - Space System Software filter
- 14 - Life & Physical Sciences (1) Apply 14 - Life & Physical Sciences filter